Project Overview

BAMA Fabrications have fabricated a lifting beam with a safe working load of 5000kg at its workshop in Peterborough for one of its existing clients based in the South of England. The beam will be used to support their on-site lifting operations.

Scope of Works

The project involved the full in-house fabrication and finishing of the lifting beam, completed to the client’s specification and load requirements. BAMA’s team managed all aspects from material preparation through to final inspection and dispatch.

Outcome

The lifting beam was completed on schedule and delivered ready for installation.

BAMA Fabrications